|
The Florida DOT (FDOT) has selected Skanska to lead the reconstruction of I-4 at S.R. 557 interchange in Central Florida.
Construction on the $70.5 million design-build project is expected to begin in September 2020 and completion is slated for summer 2023.
The design and reconstruction will transform the interchange from an existing partial cloverleaf interchange configuration to a diamond interchange.
|