|
Work is set to begin on part of an US$80 million project intended to help control backwater flooding in several southeastern Louisiana parishes. Contractor Sealevel Construction Inc. received approval from officials in St. Mary Parish recently to begin constructing a permanent barge that would be placed in Bayou Chene to block water that backs up when the Atchafalaya River is high, news outlets reported.
|